ASME Y14 35M PDF

Publisher: ASME; Publish Date: ; Pages: 24; Language: English; ISBN: Sign up to receive email notifications when updates to this. ASME Y, Revision of Engineering Drawings and Associated Documents, was adopted on October 20, for use by the Department of Defense (DoD). It is essential that this Standard be used in close conjunction with ASME Y, ASME Y, ASME YM, and ASME Y Incorporates Y on.

Author: Namuro Vukree
Country: Republic of Macedonia
Language: English (Spanish)
Genre: Business
Published (Last): 26 April 2014
Pages: 177
PDF File Size: 12.51 Mb
ePub File Size: 15.42 Mb
ISBN: 162-8-47000-971-3
Downloads: 83388
Price: Free* [*Free Regsitration Required]
Uploader: Bajas

MIL STD 0100 0299

Click Here to join Eng-Tips and talk with other members! Download Now Defense manufacturing is all about project manufacturing and project accounting. The Eng-Tips staff will check this out and take appropriate action.

Our drafter is saying any change to the Drawing requires a ECN and drawing rev change, including changing the company name in the title block rev change triggering a re-certification of the part.

Log in to continue. Hello all, My company was bought out a few years ago, and it’s been our practice to update the drawing title blocks to the new company name whenever a part is changed. Can you tell me which particular standard that can be found in? I did several searches online, and did not run across a definitive answer. My question is this: In the revision block, you will have 2 entries for the current revision.

  EFFETTO SEEBECK PDF

This, of course, makes since when the part is being changed. This means that some functions may not work as expected.

Why not add multiple rows with the same Rev Index to your revision Table. U14 to our quality system, vendors have to re-certify the parts for the new rev level.

I’ll go ahead and mark Elmar Klammer ‘s answer correct since he answered first. If you leave the Rev cell empty then you can’t add a revision symbol to the drawing.

Thank you for helping keep Eng-Tips Forums free from inappropriate posts. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

If not, create your ID now. Register now while it’s still free! Digital Transformation may be defined in a number of different ways by analysts or enterprise software vendors. Ready to log in? Does update of title block require drawing rev. Internet Explorer 9 and above Upgrade Now. If you need to call them out individually. Close this window and log in.

Red Flag This Post Please let us know here why this post is inappropriate. I believe there are standards out there than would cover this, but I don’t have them. I don’t want to get a visit from the ASME police. If not, take a moment to do it now. Asmw a bunch of other stuff there but in summary rather than replacing the title block with new ‘design activity’ they put a note above the drawing block with the new activity info. Thank you all for the help.

  HORATIO SPARKINS PDF

Drawing Revision Block & ASME Y | MySolidWorks

Promoting, selling, recruiting, coursework and thesis posting is forbidden. It may be confusing to list them in separate rows as you show.

Your asem has been submitted and will be reviewed by the MySolidWorks team. In my experience there is nothing that I can recall that does not allow for multiple engineering changes per revision.

In layman terms, what is “engineering”? However, you don’t necessarily have to blindly follow the standards – but if you do deviate don’t then have a note saying ‘drawing IAW Y Are you an Engineering professional? I hold that the revision numbers are Part revision numbers our drawing numbers are the same as our part numbersand if the Part isn’t changing, the drawing doesn’t require a revision change.